7 Steps To Bathroom Tiling In London
Our Bathroom Tiling Services
Wall Tiling
Bathroom walls tiled with metro, zellige, porcelain, natural stone supplied and fitted.
Floor Tiling
Bathroom floor tiles supplied, laid, grouted, and sealed for wet areas.
Shower Tiling
Shower walls and trays tiled with proper waterproofing, drainage, and sealing.
Wet Room Tiling
Fully waterproofed wet room walls and floors tiled with level-access drainage.
Feature Wall Tiling
Patterned tiles, mosaics, accent walls designed and installed.
Re-Tiling & Repairs
Old tiles removed, surfaces waterproofed, new bathroom tiles fitted.
Why Bathroom Tiling Coordination Matters
Bathroom tiling in London involves precise timing with waterproofing, plumbing, electrical work, and sanitaryware installation.
Without proper coordination, tiles are fitted before waterproofing is complete, drainage slopes are wrong, and moisture seeps behind tiles.
What Our Tiling Project Management Handles:
Sequences waterproofing before any bathroom tiling starts
Coordinates drainage gradients so water flows correctly
Ensures plumbing rough-in complete before tiling walls
Schedules tilers after waterproofing tested and approved
Checks grout seals, edges, and waterproofing before sign-off
Proper bathroom tiling coordination means waterproofing watertight, tiles aligned perfectly, and no moisture problems long-term.


Mike Rudland, Project Director
Why Choose Kitchen Fitters London For Bathroom Tiling
Our Bathroom Styles
A selection of styles we work with – not an exhaustive list.
What tiles do you supply and install?
We supply and install all bathroom tiles: metro, zellige, porcelain, ceramic, natural stone (marble, travertine, limestone), mosaic, patterned tiles. We source tiles from trusted suppliers, handle delivery, waterproofing, cutting, fitting, grouting, and sealing. You choose tiles, we manage supply and installation as part of your bathroom renovation.
How is bathroom tiling coordinated with other trades?
Bathroom tiling is sequenced after waterproofing (tanking systems applied and tested) and plumbing rough-in is complete. Shower tiling in London happens after drainage gradients set, before sanitaryware installation. Our project manager coordinates bathroom tiling contractors in London with plumbers, electricians, waterproofing specialists, and bathroom fitters.
Do you handle shower tiling and wet room tiling?
Yes. Shower tiling and wet room tiling require proper waterproofing (tanking systems, moisture barriers), correct drainage slopes, and watertight sealing. We coordinate waterproofing first, then tile shower walls, trays, wet room floors. All shower tiling tested thoroughly before sanitaryware installed.
Can you re-tile existing bathrooms?
Yes. We remove old tiles, assess surfaces (plaster repair, waterproofing checks), apply new tanking if needed, and install new bathroom tiles. Re-tiling is coordinated with any plumbing or electrical updates required. If you're keeping sanitaryware but want new tiling, we handle tile removal and installation carefully.
How long does bathroom tiling take?
Bathroom wall and floor tiling typically takes 2–4 days depending on size, pattern complexity, and waterproofing requirements. Grout curing takes 24–48 hours before sealing. For full bathroom renovations, tiling is usually scheduled after waterproofing and plumbing rough-in, before sanitaryware installation. Total bathroom project timeline is typically 1–2 weeks.





















